Jib crane boom margins mainly use (pitching) rotation around the vertical axis with lifting goods, the use of flexible action to meet the loading requirements, in the form of fixed, mobile and floating. Fixed jib crane mounted directly on the dock or pier base library field, can only work in situ. Some of the boom is not only pitching rotation, and some can tilt can be reversed.
2013年8月11日星期日
Introduction gantry crane
Horizontal leg of the bridge is set in two shapes constitute a bridge gantry crane. This crane orbit on the ground, mainly used in open storage yard, docks, power plants, ports and railway stations and other places for cargo handling and installation.
hoist gantry crane hoisting mechanism, trolley traveling mechanism and bridge structures, bridge crane with basically the same. Because large span, crane operating agencies were driven mostly used way to prevent the crane operation and increase the resistance generated skew even accidents. Gantry crane lifting trolley running on the bridge, and some lifting trolley is a jib crane. Bridge on both sides of the legs are generally rigid legs; span of more than 30 m, it is often the side of the rigid leg, and the other side of the bridge by a ball hinge connections and flexible leg, the mast a statically determinate systems , under external loads to avoid lateral thrust caused by the additional stress, can also be compensated
bridge gantry crane vertical temperature deformation of the wind area, in order to prevent the strong wind down the line or tip over, with wind measurement instrument and organization and operation of the crane rail clamp interlock. Both ends of the bridge can be without cantilevers; also be cantilevered at one end or both ends of the boom to extend the scope of operation. Semi-gantry
sino hoist bridge legs at one end, the other end of the outrigger, running directly on the high bench.