Gantry crane conveyor installation steps

overhead gantry crane conveyor installation steps as follows:
1 each of the legs conveyor, column, or a chemical anchor platform firmly fixed on the ground.
(2) the various components of the rack mounting bolts should be fully tightened. The roller should be flexible rotation. Roller axis line, drive pulley, bend pulley axis line and the rack should be perpendicular to the longitudinal centerline.
3 spiral tensioning stroke captain 1% to 1.5%.
4 rope switch mounted on the side of the conveyor,hoist gantry crane two coated steel wire rope with a switch connected between the appropriate tightness.
5. Deviation switch mounted on the rear sides of the nose conveyor installed in pairs. Switch vertical roll band edge perpendicular to the conveyor belt, and to ensure a high degree of vertical roller band edge is located about 1/3. Vertical distance between the roller and belt edge 50 ~ 70mm.
6 The sweeper,bridge gantry crane guide trough with rubber scraper conveyor belt full contact should be, otherwise, regulating and guiding trough cleaner mounting bolts to make contact with the conveyor belt scraper.
7 After the installation is correct test run. Test run time less than 2 hours.