Jib crane boom margins mainly use (pitching) rotation around the vertical axis with lifting goods, the use of flexible action to meet the loading requirements, in the form of fixed, mobile and floating. Fixed jib crane mounted directly on the dock or pier base library field, can only work in situ. Some of the boom is not only pitching rotation, and some can tilt can be reversed.
2013年7月26日星期五
Ladder gantry crane design
①, climb the ladder overhead gantry crane installation location: arranged at the rigid legs.
②, ladder width: 600 mm.
③, ladders main limb: thickness 3 mm with folded trough. Also channel 12 can be used directly.
④, stepping ladder: textured board with a 3 mm thick hems production. Short side about 5 mm high.
⑤, ladders on both sides of the fence. Wire and tube production.
⑥, ladder and outrigger design with high contact at the 100-150 mm high stand. Standoffs with the 12th channel welded together. Generally have 3-4 stand.
⑦, at no fence into the cab. There is the other side of the main limb ladder fence and a pass to top.
⑧, enter the cab platform upwards 1600-1800 millimeters. There is a handle. For the driver's cab from the platform to the step ladder leg, hand grasp with. Objective: To secure.
⑨, bridge gantry crane ladder stepping interval set by the requirements of ergonomics. Typically 250-300 mm.